To the central content area

106 Hsinchu City Soil and Groundwater Pollution Investigation and Verification Program

Absrtact
The project has been signed on November 22, 105 and the term of compliance is from January 1 to October 106 As of December 31, 2012, the total funding for the project was NT $ 8,080,000 and the project manpower was the project cost A manager and a resident engineer, the specific results are as follows: First, the underground water well monitoring (I) Groundwater Pollution Warning Network in Hsinchu Science Park Dry season monitoring A total of 14 tests were conducted to detect Results Heavy metals and volatile organic compounds were lower than the regulatory standards; Fengshui period testing a total of 7, Volatile organic compounds are lower than the regulatory standards. (B) Xiangshan Industrial Zone Dry season groundwater quality monitoring a total of 23 tests, including Xiangshan Park, Dazhuang Park, flooding activity center, F010, W01-12 ammonia value exceeded the monitoring standards, Fragrant Hill Stadium, Fragrant Hill Stadium after the garden has a total hardness, total dissolved solids and total Machine carbon exceeds the monitoring standards; W9912, W103-01 trichlorethylene over the regulatory standards, W104-01 detected vinylidene chloride exceeded the regulatory standards; a total of 6 wet mouth detection, Test results W01-12, F010, W103-01 detected ammonia exceeded the monitoring standards, W01-12 Total organic carbon detected exceeded the monitoring standard and W104-01 detected more than vinylidene chloride Standard, F010 Trichlorethylene detected exceed the monitoring standards, W9912, W103-01 detected Trichlorethylene exceeds the regulatory standards; the supplementary survey conducted in December shows that F010 And W103-01 Trichlorethylene dropped below the monitoring, W9912 Trichlorethylene over regulatory standards Quasi and slightly increased, W104-01 vinylidene chloride concentration remained at the monitoring standards nearby. (C) Xiangshan Industrial Zone civilian wells survey part of the completion of eight wells with the use of groundwater wells visit, and Implementation of five civilian wells groundwater testing, including Long and Rubber (Niu Po ​​Road 376, Lane No. 16) Trichlorethylene over the monitoring standards; In addition to the wells for the return visit to declare groundwater, Send a brochure. (4) Carry out 2-site groundwater monitoring well downstream of Hsinchu Oil Supply Service Center Water sampling and testing, detected in the side gate of the Petrol depot Benzene and methyl tert-butyl ether ultra Exceeded the standards of control, ground water contamination of the site of investigation has spread to the outside of the site, it is necessary Seeking CNPC emergency response, CNPC responding to the hydraulic control measures; For the team in the wet season for the downstream two monitoring wells continued testing, benzene and methyl tert-butyl Ether measurements have dropped below the monitoring standards, showing initial results of hydraulic control, environmental protection CNPC requires that CNPC should incorporate this strain of groundwater pollution into the improvement plan and do its best Speed ​​delivery change control drawing. Second, the pollution control site inspections and verification (A) to develop a site-level management system, and in accordance with the frequency of hierarchical inspection site inspections carried out for the operation So far 246 inspections have been completed. (B) to complete the Xiangshan gas station, four-dimensional gas station pollution control site announcement operation, and completed seamounts Paragraph 492, according to the soil law, Article VII five implementation of the necessary measures for contingency management operations. (III) There have been 7 meetings held in 106 annual meetings to promote the improvement of soil and groundwater pollution, and during the period Into the Kanto Bridge station soil pollution strain necessary plan book, No. 492 Haishan ground soil pollution Strain Necessary Measures of Strain Planning Plan, Progress Report of Park No. 19 Well Control Project, Kanto Bridge Gas station pollution strain necessary measures to extend the project, Xiangshan gas station control plan, four-dimensional Gas station control picture book, bright gas station control program changes and the pollution accident at the Xiangshan gas station Necessary measures to improve the completion of the review of the report. Third, groundwater monitoring wells inspection, appearance and repair and maintenance of internal maintenance operations Completion of monitoring wells inspection 226 times, well maintenance update 11 times, well facilities repair 5 Times, well photography and micro-water test well conditions assessment operations a total of 22 times, and then completion of 12 wells and wells Foreign objects excluded 5 times. Fourth, underground storage tank control operations (A) to complete the underground storage tank online declaration check operation 106 annual first and second underground storage Slot operators to declare the inspection operations, check the results are declared on time. (2) To complete the soil gas anomaly tracking operation at JiaLong gas station and complete the adjustment of soil and groundwater check. (C) to complete the bridge gas station soil and groundwater pollution survey operations. (D) to complete the substandard eggplant gas stations to track the missing job tracking. (E) to complete the 12 gas station leak test site function test and oil and gas testing operations, test results Each station's PID / FID are no exceptions. (F) to complete the GC gas chromatogram detection and analysis of homework 8:00 (Jialong gas station 3:00, Eggplant gas station 5 o'clock).
Keyword
Soil, groundwater, Hsinchu City
Open
top